Hot Weather Concreting Starts Long Before the First Truck Arrives
Every concrete placement begins long before the first truck arrives on site. During hot weather, that planning becomes even more critical. Elevated temperatures, low relative humidity, solar radiation, and wind can dramatically change the behaviour of fresh concrete, increasing the risk of rapid moisture loss, reduced workability, plastic shrinkage cracking, cold joints, and finishing challenges. At the same time, these conditions place additional physical demands on the peop
robchadjohnson
Jul 215 min read